Commercial

Does your business own or lease a business premises? Installing solar panels may significantly reduce your energy bills and reduce your CO2 emissions at the same time.
 

If your business currently has a high electricity bill then commercial solar panels usually have a far shorter payback period and increased profitability compared to domestic systems due to the larger number of panels a commercial building can usually accommodate. 

Take a look at one of our commercial projects below which we recently won the Regional project of the year award for at the Energy Efficiency Awards.

 
M E Solar is an award winning MCS accredited company so contact us now and see how we can work with you on your commercial solar project.
Awards

CASE STUDIES

Commercial solar panels

The Queens Diamond Jubilee Leisure Centre – Rugby

Client –                         GLL & Rugby Borough Council
System size –              163kw
Panel Qty –                   376

Inverter Qty –               4
Installation time –       3 Weeks
Annual generation –   140,000Kwh

Payback timeframe – 4 Years

Project Background

The Queens Diamond Jubilee Leisure Centre had secured funding from Sport England to install Solar panels to their building. M E Solar was chosen to deliver a solar project within the deadline and budget set by Sport England. After an initial feasibility study was carried out it was established that due to the extremely high electricity usage of the building, installing solar panels would make a significant reduction in electricity costs, saving the leisure centre approximately £40,000 annually.

The Challenge

The leisure centre is a very busy public building with 1000`s of visitors coming and going on a daily basis. One of the big challenges for our team was to design & install the system with minimum disruption or downtime to the sites operations. This was achieved by meticulous planning every step of the way in regards to staging areas, roof access areas and equipment delivery timings including plannning out of hours electrical night work.

Project Completion

After a 3week installation, the project was completed and handed over to the Leisure centre in February 2025 with no delays. Twelve months on and the systems performance has been even better than initially predicted. At the 12 month point the system has produced 152,000kwh and saved 29 Tonnes of CO2. over the course of the Solar panels lifespan and based on current energy prices in 2026 the system is on track to save the Leisure Centre over £1million. So successful is this project, at the 2026 Energy Efficiency Awards it won the Regional project of the year award for male scale commercial projects under £250,000. 

The system boasts fully optimised system with panel level monitoring, rapid shutdown for additional safety and easy access for future maintenance such as panel cleaning ensuring the systems performance remains optimal.

 

Contact Us

If you would like to find out more about us and our services, or if you would like us to provide you with a quote. Please fill in the contact form provided and we will be in touch with you shortly.