Commercial
If your business currently has a high electricity bill then commercial solar panels usually have a far shorter payback period and increased profitability compared to domestic systems due to the larger number of panels a commercial building can usually accommodate.
Take a look at one of our commercial projects below which we recently won the Regional project of the year award for at the Energy Efficiency Awards.
CASE STUDIES
The Queens Diamond Jubilee Leisure Centre – Rugby
System size – 163kw
Panel Qty – 376
Inverter Qty – 4
Installation time – 3 Weeks
Annual generation – 140,000Kwh
Payback timeframe – 4 Years
Project Background
The Challenge
The leisure centre is a very busy public building with 1000`s of visitors coming and going on a daily basis. One of the big challenges for our team was to design & install the system with minimum disruption or downtime to the sites operations. This was achieved by meticulous planning every step of the way in regards to staging areas, roof access areas and equipment delivery timings including plannning out of hours electrical night work.
Project Completion
After a 3week installation, the project was completed and handed over to the Leisure centre in February 2025 with no delays. Twelve months on and the systems performance has been even better than initially predicted. At the 12 month point the system has produced 152,000kwh and saved 29 Tonnes of CO2. over the course of the Solar panels lifespan and based on current energy prices in 2026 the system is on track to save the Leisure Centre over £1million. So successful is this project, at the 2026 Energy Efficiency Awards it won the Regional project of the year award for male scale commercial projects under £250,000.
The system boasts fully optimised system with panel level monitoring, rapid shutdown for additional safety and easy access for future maintenance such as panel cleaning ensuring the systems performance remains optimal.